Home > Building a House in Thailand

TITLE  +   - 
FILE NAME  +   - 
DATE  +   - 
POSITION  +   - 
000.jpg
The Plan2646 views
010.jpg
The rebar for the columns1580 views6 No 12 mm bars with 6 mm ties at 150 mm centres
009~0.jpg
Concrete footings1605 views"Hand balling" the concrete for the footings. We used 'ready-mix' for these pours.
008.jpg
The Foreman1712 views
007.jpg
Ceremony1735 viewsA ceremony is required before building proper could commence
006.jpg
The Bar Bending "Machine"1774 viewsConsisting of a railway sleeper with strategically positioned re-bar cut offs
005.jpg
Digging the Column Footings1564 views
004.jpg
Column Footing Excavation2272 views1.00 m x 1.00 m excavations down to solid.
003.jpg
Accommodation1885 viewsAccommodation for the night watchman/cement storage shed
002.jpg
Setting Out1850 viewsThe sight rails
001~0.jpg
The Green Field Site1834 views1 Rai (1,600 sq.m.) of land raised and ready for building.
020.jpg
Filling for the Floor Slab1384 viewsImported shale was used as fill to support the 150 mm insitu concrete floor slab.
019.jpg
Ground Bean Rebar1397 viewsMost beam rebar was 6 or 7 x 12 mm bar tied at 150 mm centres, depending on the load.
018.jpg
Ground Beam Shuttering1460 views
017.jpg
Ground Beam Shuttering1485 viewsGenerally the ground beams were 150 mm x 300 mm.
016.jpg
Shuttering and Rebar for the Columns1499 views150 mm x 150 mm columns.